1. What does RRSK stand for in the context of Indian Railway Finance?

 
 
 
 

2. Who is the Vice-Chairman of the Central Hindi Committee?

 
 
 
 

3. In case of signals falling within 2 metres from the live parts of the OHE, the protection screen shall be connected to—-.

 
 
 
 

4. Safety Integrity level to be maintained for Hardware of any El is

 
 
 
 

5. According to the Official Language Rules, Andaman and Nicobar Islands are located in which region?

 
 
 
 

6. Full form of IREPS is

 
 
 
 

7. Coil resistance of polarized relay is —-.

 
 
 
 

8. Material used for manufacturing ground connection of 143 mm stroke point machine is

 
 
 
 

9. In which states has Urdu been declared as the second official language?

 
 
 
 

10. The closed position of lifting barrier from the horizontal shall be within — degrees.

 
 
 
 

11. The IB signal is controlled by —-.

 
 
 
 

12. When was the Railway Budget merged with General Budget?

 
 
 
 

13. Base Station Sub System contains (BTS)

 
 
 
 

14. The interface between CCIP and the El is called—

 
 
 
 

15. Which languages are expected to be used between Central Government offices?

 
 
 
 

16. In ISDN PRI, transmission rate is —

 
 
 
 

17. In Revenue, PU 04 is used for

 
 
 
 

18. EPC contract stands for —

 
 
 
 

19. The type of lightning & surge protection devices used in IPS system is

 
 
 
 

20. Recommended gradient in the station yard is

 
 
 
 

21. Point detection is to be in achieved through —— Standard IV (R)interlocking.

 
 
 
 

22. All new works costing above Rs.2.5 Crore are sanctioned by Railway Board in the Book.

 
 
 
 

23. In MACL signalling, the length of Block Overlap is –

 
 
 
 

24. The first women chief minister in India was

 
 
 
 

25. Under the provisions of which section of the Official Language Act 1963 was the Parliamentary Committee constituted?

 
 
 
 

26. Loading Coil in telecom cable joint is characterised by —.

 
 
 
 

27. Relays used at location in SSDAC for BPAC application for VR & PR circuits are

 
 
 
 

28. The budget allotment for preliminary survey of work shall be charged under—

 
 
 
 

29. B” type choke connected in series with track feed of DC track circuit in RE area has Resistance (R) & Impedance (Z) at 50 Hz.

 
 
 
 

30. Minimum horizontal distance of any building on a passenger platform from centre line of track from 305 mm above platform level to 3430 mm above rail level should be —–.

 
 
 
 

Question 1 of 30

Scroll to Top