1. A work carried out with Non-Railway Funds Deposit work Quotation Work Rate contract Zonal contract 2. An item of work, connected with the main work, can be added to the estimate through Completion Estimate Revised Estimate Detailed Estimate Supplementary Estimate 3. Port numbers are the addressing used to identity Individual nodes Specific TCP/IP applications Cisco routers Separate networks 4. Any new station infringement to schedule of dimension requires the sanction of: CRS DRM PCSTE PCOM 5. What is the Official Language of Arunachal Pradesh? Maithili Hindi Santhali English 6. Minimum visibility distance of Loop line starter signal in meters as per SEM shall be: 200m 400m 300m 600m 7. CRS sanction is not required for which signalling work: Auto signalling Addition loop line New station Temporary RE alone commissioning 8. Under PU 53, which type of revenue expenditure is booked? Expenditure on Laptop purchased by officers Cost of computer hardware Interest on delayed deposit of NPS contributions All India Leave Travel Concession 9. In Kavach system, at what distance LC Gate Tag on Main Line is placed before approach of the LC Gate. 1000 m 600 m 400 m 200 m 10. What is the classification of IB Signal? Class D Class A Class C Class B 11. Nature of unemployment in agriculture in India is None of these Seasonal Disguised Both Seasonal and Disguised 12. With a half-wave rectified voltage across the load resistor, load current flows for what part of a cycle? 0 degrees 180 degrees 360 degrees 90 degrees 13. _______ affects both the fiber attenuation and dispersion. Splices Refractive index Connectors Micro-bending 14. Inspection schedule of equipment in ART by ADSTE/DSTE is Annually once Weekly once Quarterly once Monthly once 15. In RE area, direct feeding of any signals from station/Goomty/LBs shall not be more than: 90 m 120 m 1000 m 180 m 16. Which type of revenue exp is booked to PU 29? Cost of material directly purchased Children Education Allowance Payments to reengaged staff, officers and consultants Leave encashment 17. Calling ‘ON’ signal can be placed below a Stop signal except: Starter Signal Last Stop Signal Repeater signal First Stop Signal 18. Which one of the following Articles of the Constitution of India has provision for the President to proclaim emergency? Article 360 Article 352 Article 355 Article 356 19. RE mast shall be provided at minimum distance rear from any signals: 10 m 30 m 20 m 45 m 20. VTP stands for what technology? Virtual Tunneling Protocol VLAN Trunking Protocol Virtual Trunking Protocol VLAN Tunneling Protocol 21. Which method is adopted for providing wireless communication in tunnels? Leaky Coaxial Cable Optic fiber cable Quad Cable PIJF Cable 22. What is the periodicity of overhauling Double line Block instrument 25 years 4 years 10 years 7 years 23. Separation of two different Electrical sections is achieved through: IBS Neutral point AT SSP 24. In which part of the Constitution are the Articles 343-351 that give information about Official Language, available? Part-VII Part XVII Part-VI Part – V 25. Which of the following is not an open sources operating system Linux Windows Ubuntu Android 26. Who is called the Guardian of Public Purse? Parliament Council of Ministers Comptroller and Auditor-General President 27. WPC license is not required for captive use of VHF sets GSM-R OFC LTE 28. In IBS, the IB Telephone is connected to Rear station IB Hut Advance station Both stations 29. Revised Estimate is prepared based on earnings/expenditure trends of—-, and projections for the balance period. First 9 months First 6 months First 5 months First 3 months 30. Minor heads in works segment are known as Budget Grant Demands for Grants Sources of Finance Plan heads Loading … Question 1 of 30