1. The number of quads required for working of UFSBI in Double line along with Up & Down BPAC is One and half quad One quad Two and Half quad Two quad 2. Tender committee and Accepting authority for single tenders should be _______ Level to be decided by GM Two steps above the normal tenders One step above normal tenders Same level committee as for open tenders 3. Who can be Contractor’s Authorized Engineer as per General Conditions of Contract (GCC)? A graduate engineer or equivalent having more than 5 years experience in the relevant field of construction work A graduate engineer or equivalent having more than 3 years experience in the relevant field of construction work A graduate engineer or equivalent having more than 4 years experience in the relevant field of construction work A graduate engineer or equivalent having more than 6 years experience in the relevant field of construction work 4. What is the nominal coil resistance value of QBAT Relay as per the latest Specification? 1 Ohm 9 Ohm 1000 Ohm 350 Ohm 5. What is the Standard Form used to revoke Suspension Order under the Railway Servants (Discipline & Appeal) Rules, 1968? Standard Form 4 Standard Form 11 Standard Form 1 Standard Form 2 6. Which of the following Software application is for the Automation of Train Control Charting at Divisional Control Office? COA FOIS PRS ICMS 7. For a Track circuit length up to 700 mts, what is the maximum permissible rail resistance of rail and bonding allowed 1.5 ohms per 1000 mts 2.0 ohms per 1000 mts 1.0 ohm per 1000 mts 0.5 ohms per 1000 mts 8. How many official languages are covered under the 8th Schedule of the Indian Constitution? 22 36 14 15 9. In Kavach Automatic Train Protection System, Movement Authority is generated by _______ based on the inputs received from Signalling Interlocking? Remote Interface unit Loco Kavach Network Management System Stationary Kavach 10. After how many years, the commuted portion of pension is restored? 20 years 15 years 12 years 10 years 11. Changeover of EI system shall be done from Main to Hot Standby and vice-versa once _______ under the supervision of sectional SSE/JE when there is no train movement in the yard. Half yearly Quarterly 15 days Monthly 12. Minimum horizontal distance from Centreline of track to the nearest part of a signal post for new works is _______ 2575mm 2135mm 2360mm 2725mm 13. Which of the following statement is not true about the type of Route Indicator to be provided on a Home Signal? For speed in excess of 15 kmph, Direction type Route Indicator can be provided for more than 3 diversions in any side of Main line For speed in excess of 15 kmph, Direction type Route Indicator with LED Matrix can be provided for more than 3 diversions on any side of main line For speed in excess of 15 kmph, Direction type Route Indicator can be provided for up to 3 diversions in any side of Main line For speeds not exceeding 15 kmph, any Route Indicator of approved design can be provided 14. Sanction of excess over original sanctioned cost (abstract cost) due to reasons other than price escalation can be done by zonal railways upto _______ 0.1 0.2 1 0.5 15. The distance between the signal and the mast in front of it shall not be less than _______ 10 metres 50 metres 40 metres 30 metres 16. What shall be the number of physical ASR/ALSR relays in a 500 routes of distributed Electronic Interlocking installation? Depends on the complexity of the yard Zero None of the given options Equal to the no. of CHYRs 17. Which of the following is a client-server program that provides an IP address, subnet mask, IP address of a router, and IP address of a name server to a computer. NAT DHCP CIDR ISP 18. What does abbreviation “IRPSM” stand for? Indian Railways Planning & Sanctions Management Indian Railways Projects & Surveys Module Indian Railways Project Sanctioning Mechanism Indian Railways Projects Sanctions & Management 19. As per the concept of Lightning protection zones for lightning protection, LPZ OA means None of these Internal having possibility of indirect strike Both external & internal External having a possibility of Direct strike 20. What is the monetary limit of powers to dispense with calling of tender and to accept quotations in each case for a JAG Officer without finance concurrence for execution of urgent works related to safe running of trains? Up to Rs. 10 Lakhs Up to Rs. 5 Lakhs Up to Rs. 4 Lakhs Up to Rs. 2 Lakhs 21. What is the time limit for replying to the request for information if the request has been made to the PIO under Right to Information Act 60 days 30 days 15 days 45 days 22. How much fees is to be paid for making application before Central Administrative Tribunal? Rs. 100 Rs. 1000 Rs. 50 Rs. 500 23. In an electronic interlocking system, which of the following are taken as Vital outputs ? TPRS Buttons HR, DR ECR’s 24. In single line RE Area, what is the maximum permissible length between Point contactor and Point motor of IRS S-24 Point machine having AC immunity level of 160 Volt (consider factor of safety as 1.5)? 1100 Metre 2200 Metre 2800 Metre 910 Metre 25. Which Sub-Committee of the Parliamentary Committee on Official Language inspects Railway Ministry? Fourth Sub-Committee First Sub-Committee Third Sub-Committee Second Sub-Committee 26. If OFC and 6 quad underground cables are to be laid in the same trench, at what depth they should be laid ? 100cm & 80cm 120cm & 100cm 120cm & 120cm 100cm & 100cm 27. In simplex mode, data communication between two devices is _______ Unidirectional none of the options is correct Multi directional Bi directional 28. Which of the following with respect to Ferro Resonant AVR used for stabilising ac supply is not True Immune to short circuit at output Output voltage is independent of frequency variation Self-protection against overload Complete automatic and continuous regulation 29. What is the value of default administrative distance for a static route in a Data Network? 1 0 120 255 30. Sanction of works is processed through _______ IRPSM IPAS NTES IREPS Loading … Question 1 of 30